Warehouse floors that hold up
to forklifts, racking, and decades of operations.
Distribution centers run 16+ hour days. Hard wheels, dropped pallets, leaking hydraulic fluid, and seam-free wash-down cycles. The coating either survives or it fails — and a failure on an active aisle is expensive.
Pain points specific to Warehouses & Distribution.
-
Point-load impact
A loaded pallet jack is roughly 4,000 lb on four small wheels. The substrate sees compressive forces that exceed most decorative coatings' tolerance.
-
Racking foot wear
Static load at racking feet, slight movement during seismic events or high winds, abrasion. We spec heavier-build systems under aisles.
-
Hydraulic fluid & battery acid
Forklift leaks happen. Coatings that look good on day one but soften when wet with hydraulic fluid become a liability.
-
Wash-down & seam integrity
Cove base integration and proper coving at floor-wall joints prevent water migration into the substrate.
What we typically spec for Warehouses & Distribution.
Polyaspartic Quartz
9-step aggregate-broadcast system. The default warehouse spec — slip-rated, impact-tolerant, repairable.
View system →Polyaspartic Flake
Lighter-duty alternative for office areas, packout zones, and crossover areas where forklift traffic is light.
View system →Moisture Vapor Barriers
Slab-on-grade construction in the Gulf Coast frequently needs MVB. We test before we specify.
View system →Details that get overlooked.
-
Line striping & aisle marking
OSHA-compliant aisle striping, flow direction, and pedestrian zones integrated into the coating.
-
Static dissipative options
ESD coatings for electronics, semiconductor, and pharmaceutical operations. Tested to resistivity spec.
-
Phased install
Aisle-by-aisle install lets operations continue. We work around your shipping windows.
-
Slip rating
Wet-environment areas spec'd for higher CoF (coefficient of friction). Aggregate broadcast tuned to operations.
Recent Warehouses & Distribution project.
150,000 sq ft regional distribution center, polyaspartic quartz throughout production, polyaspartic flake in office and packout. MVB required after CaCl testing showed elevated moisture. Phased over six weekends with continuous operations.
Get the right system spec'd for your Warehouses & Distribution project.
On-site assessment, line-itemed bid, and a system spec engineered to your operations — not a catalog template.